$GEV 0.62 Developing
- Date
- Jul 25, 2026
- Mentions
- 1
- Unique authors
- 1
- Sector
- semiconductors
- Stance
- neutral
- On card
- no
Sentiment history
No sentiment history available for $GEV yet.
Sentiment
Notable posts
-
neutral 3410 eng
UPDATED FIB LEVELS FOR POPULAR STOCKS AI Utilities • $IREN $51 • $NBIS $177 • $CIFR $17 • $CRWV $100 AI Power • $EOSE $7 • $BE $237 • $NVTS $22 • $VRT $282 AI Hardware • $NVDA $192 • $TSM $408 • $ASML $1,618 • $MU $730 AI Applications • $PLTR $129 • $NOW $109 • $CRWD $598 • $SNOW $181 AI Connectivity • $AVGO $377 • $ALAB $305 • $CRDO $195 • $MRVL $236 Space • $RKLB $106 • $ASTS $89 • $PL $31 • $BKSY $32 Quantum • $IONQ $52 • $RGTI $15 • $QBTS $20 • $INFQ $13 Drones • $ONDS $10 • $AVAV $175 • $KTOS $52 • $UMAC $24 Nuclear • $OKLO $50 • $UUUU $12 • $GEV $906 • $LEU $151 Photonics • $AAOI $164 • $LITE $698 • $COHR $283 • $AEHR $76 CPU Bottleneck • $AMD $383 • $INTC $91 • $ARM $299 • $AMKR $57 Physical AI • $TSLA $382 • $AMZN $230 • $GOOGL $357 • $ISRG $394
view on X → -
bullish 1779 eng
Did a stock draft with some friends and these are the 12 picks I have to hold until June 2027… 1. $NVDA 2. $AMD 3. $GEV 4. $TXN 5. $RKLB 6. $RDDT 7. $GOOGL 8. $FIX 9. $AAPL 10. $GLXY 11. $SNDK 12. $BE Am I cooked?
view on X → -
neutral 1430 eng
UPDATED FIB LEVELS FOR POPULAR STOCKS AI Utilities • $IREN $31 • $NBIS $160 • $CIFR $17 • $CRWV $67 AI Power • $EOSE $3 • $BE $192 • $NVTS $8 • $VRT $245 AI Connectivity • $AVGO $368 • $ALAB $251 • $CRDO $183 • $MRVL $168 AI Hardware • $NVDA $190 • $TSM $377 • $ASML $1,713 • $MU $672 AI Applications • $PLTR $131 • $NOW $101 • $CRWD $196 • $SNOW $259 Physical AI • $TSLA $369 • $AMZN $245 • $GOOGL $335 • $VPG $84 Space • $RKLB $56 • $ASTS $47 • $PL $20 • $RDW $8 Quantum • $IONQ $26 • $RGTI $13 • $QBTS $16 • $INFQ $8 Drones • $ONDS $6 • $AVAV $99 • $KTOS $42 • $MRCY $92 Nuclear • $OKLO $33 • $UUUU $8 • $GEV $906 • $LEU $132 Photonics • $AAOI $87 • $LITE $636 • $COHR $311 • $AEHR $66 CPU Bottleneck • $AMD $467 • $INTC $88 • $ARM $242 • $AMKR $57
view on X → -
neutral 1400 eng
UPDATED FIB LEVELS FOR POPULAR STOCKS Space • $RKLB $92 • $ASTS $90 • $PL $32 • $RDW $12 Quantum • $IONQ $55 • $RGTI $19 • $QBTS $20 • $INFQ $13 Drones • $ONDS $9 • $AVAV $169 • $KTOS $52 • $MRCY $104 Nuclear • $OKLO $50 • $UUUU $15 • $GEV $906 • $LEU $182 Photonics • $AAOI $160 • $LITE $825 • $COHR $369 • $AEHR $110 CPU Bottleneck • $AMD $512 • $INTC $125 • $ARM $420 • $AMKR $83 Physical AI • $TSLA $382 • $AMZN $230 • $GOOGL $357 • $ISRG $397 AI Utilities • $IREN $56 • $NBIS $206 • $CIFR $17 • $CRWV $111 AI Power • $EOSE $7 • $BE $265 • $NVTS $24 • $VRT $282 AI Hardware • $NVDA $192 • $TSM $437 • $ASML $1,732 • $MU $1,013 AI Applications • $PLTR $121 • $NOW $95 • $CRWD $624 • $SNOW $181 AI Connectivity • $AVGO $368 • $ALAB $372 • $CRDO $262 • $MRVL $292
view on X → -
neutral 1088 eng
UPDATED FIB LEVELS FOR POPULAR STOCKS Space • $RKLB $92 • $ASTS $79 • $PL $26 • $RDW $8 Quantum • $IONQ $44 • $RGTI $16 • $QBTS $20 • $INFQ $10 Drones • $ONDS $7 • $AVAV $174 • $KTOS $52 • $MRCY $104 Nuclear • $OKLO $50 • $UUUU $12 • $GEV $906 • $LEU $132 Photonics • $AAOI $103 • $LITE $636 • $COHR $311 • $AEHR $59 CPU • $AMD $515 • $INTC $120 • $ARM $304 • $AMKR $64 Physical AI • $TSLA $382 • $AMZN $230 • $GOOGL $357 • $ISRG $397 AI Utilities • $IREN $31 • $NBIS $213 • $CIFR $17 • $CRWV $67 AI Power • $EOSE $4 • $BE $265 • $NVTS $13 • $VRT $282 AI Connectivity • $AVGO $334 • $ALAB $341 • $CRDO $210 • $MRVL $225 AI Hardware • $NVDA $192 • $TSM $419 • $ASML $1,732 • $MU $869 AI Applications • $PLTR $121 • $NOW $104 • $CRWD $171 • $SNOW $181
view on X → -
neutral 890 eng
THE ELECTRICITY VALUE CHAIN • $CCJ uranium supply • $CEG nuclear baseload • $SMR modular nuclear reactors • $OKLO micro-nuclear generation • $EOSE zinc long-duration storage • $GEV power conversion hardware • $VRT power distribution & cooling • $VST flexible generation & storage • $TSLA utility-scale lithium storage • $FSLR thin-film solar for hyperscale • $NNE utility-scale renewable buildout • $TLN North American renewable generation • $BWXT nuclear components & specialty fuel
view on X → -
neutral 793 eng
THE 5 LAYERS OF AI POWER DELIVERY 1. Facility Power Intake • $CAT supplies backup generation • $GEV supplies grid equipment & gas turbines • $ETN provides switchgear, ATS & electrical distribution • $HUBB supplies grid & power distribution components • $NVT provides enclosures & electrical protection systems • $BE supplies on-site fuel cell power that helps bypass grid constraints 2. AC-to-DC Conversion • $ON supplies silicon carbide power devices • $POWI provides high-voltage AC-to-DC conversion ICs • $TXN provides power supply controllers & conversion ICs 3. Intermediate Bus Conversion • $VICR provides high-density intermediate bus modules 4. Point-of-Load • $AOSL supplies integrated power stages • $MPWR supplies point-of-load power for Nvidia systems • $ADI provides multiphase controllers & power management • $STM supplies SiC, GaN & power-management components for next-generation AI power delivery 5. The 800V DC Transition • $NVTS is working with $NVDA on its 800V HVDC roadmap • $VRT captures the transition through rack power, UPS & cooling infrastructure
view on X → -
neutral 747 eng
THE $NVDA VERA RUBIN SUPPLY CHAIN BREAKDOWN Nvidia’s Vera Rubin is ramping into full-scale production and reshaping the AI rack bill of materials in three major ways: more HBM per rack, a shift from pluggable to co-packaged optics and the move to 800VDC power. Here are the companies positioned to capture each transition: Memory Storage (content-per-rack story) • $MU, $SNDK, $SKHY and Samsung sit at the memory and storage layer as next-gen AI systems require more bandwidth, more capacity and faster data access. Advanced Packaging (bottleneck that gates everything) • Foundry / packaging: $TSM, $AMKR, $INTC • Packaging equipment: $AMAT, $LRCX, $KLAC, $ASML • Test / validation: $TER, $AEHR • Substrates / materials: $TTMI Optical Communication (CPO transition) • Optical modules: $COHR, $LITE, $AAOI • CPO / switching chips: $AVGO, $NVDA, $MRVL • High-speed connectivity: $CRDO, $ALAB • Fiber / networking: $GLW, $NOK, $CSCO, $ANET • Silicon photonics / packaging: $TSM, $GFS, $TSEM 800VDC Power Supply (architecture shift) • Wide-bandgap semis: $STM, $ON, $NVTS, $POWI, $WOLF • Power management / hardened devices: $MPWR, $ADI, $TXN, $AOSL, $VICR, $MCHP • Motherboard / connector / power module: $FLEX, $APH, $TEL • Infrastructure / power delivery: $VRT, $ETN, $GEV Compute System (integrators) • $DELL, $HPE, $SMCI provide the system-level integration layer that turns all of these components into deployable AI infrastructure.
view on X →
Signal history
| Date | Score | Signal | Mentions | Rank |
|---|---|---|---|---|
| 2026-06-07 | 0.48 | Noisy | 1 | — |
| 2026-06-13 | 0.60 | Developing | 1 | — |
| 2026-06-17 | 0.39 | Noisy | 1 | — |
| 2026-06-18 | 0.28 | Weak | 1 | — |
| 2026-06-20 | 0.50 | Developing | 2 | — |
| 2026-06-21 | 0.36 | Noisy | 1 | — |
| 2026-06-22 | 0.59 | Developing | 1 | — |
| 2026-06-23 | 0.43 | Noisy | 1 | — |
| 2026-06-27 | 0.62 | Developing | 1 | — |
| 2026-06-30 | 0.59 | Developing | 1 | — |
| 2026-07-04 | 0.45 | Noisy | 1 | — |
| 2026-07-14 | 0.30 | Weak | 1 | — |
| 2026-07-18 | 0.59 | Developing | 2 | — |
| 2026-07-19 | 0.64 | Developing | 1 | — |
| 2026-07-25 | 0.62 | Developing | 1 | — |